GCB13-00139
| GCB-Shearwall | 12/20/2013 | 12/23/2013 | 12/23/2013 3:21:37 PM | P | PASS |
|
|
Mike ###-#### call first. Exterior shear walls ok. Engineer has provided staple conversion and has accepted the in place holddowns.. Ok to cover exterior walls.
|
BLD13-01075
| BLD-Framing/Rough-in | 12/20/2013 | 12/23/2013 | 12/23/2013 1:45:35 PM | P | PASS |
|
|
Joe Genovese Phone #: ###-####
|
BLD13-01287
| BLD-Wall cover | 12/20/2013 | 12/23/2013 | 12/23/2013 11:10:29 AM | A | PART |
|
|
Wall cover lets try it again. They are suppose to work all weekend >> Inspection requested via web by Mike McHargue. base layers on 1hr. floor ceiling assemblies ok.
|
BLD13-03277
| BLD-Framing/Rough-in | 12/20/2013 | 12/23/2013 | 12/23/2013 10:06:12 AM | A | PASS |
|
|
Lock Box on Door is 1-3-5-9 Call Brian McCoy to Meet you on- Site Please. ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy. Interior steel stud framed walls ok.
|
BLD13-01808
| BLD-Final | 12/19/2013 | 12/23/2013 | 12/21/2013 3:13:06 PM | A | CANC |
|
|
PAUL Phone #: ###-#### Inspection cancelled from web by: Paul Thompson
|