BLD14-03070
| FIRE-Final Inspection | 12/23/2016 | 12/23/2016 | 12/23/2016 1:41:18 PM | P | PART |
|
|
Life safety passed in apartments 107, 108, 207, 208, 307 and 308. Waiting on the corrected as-builts for the fire sprinkler system prior to a final sign off.
|
BLD16-03890
| FIRE-Final Inspection | 12/22/2016 | 12/23/2016 | 12/23/2016 1:40:05 PM | A | PASS |
|
|
Life safety passed. Per plan review the inactive leaf can have the hardware removed and single action on the operable leaf.
|
FIR16-00284
| INSP-Sprinkler Rough-in | 12/22/2016 | 12/23/2016 | 12/23/2016 1:32:08 PM | P | PASS |
|
|
See the city approved plans for specific rooms on the second floor where the rough to cover passed. Tenting deficiencies are noted in one of the apartments and it is not ok for cover
|
FIR16-00780
| INSP-Sprinkler Rough-in | 12/22/2016 | 12/23/2016 | 12/23/2016 8:45:06 AM | A | PASS |
|
|
Underground supply piping is ok to cover
|
BLD16-04262
| FIRE-Final Inspection | 12/22/2016 | 12/23/2016 | 12/23/2016 8:23:27 AM | A | PASS |
|
|
Life safety already passed
|