BLD18-03725
| BLD-Aging Inspection | 12/23/2019 | 12/23/2019 | 12/26/2019 2:13:09 PM | | PEND |
|
|
|
BLD19-03575
| BLD-Final | 12/19/2019 | 12/23/2019 | 12/23/2019 4:33:06 PM | P | NR |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope
|
BLD19-02406
| BLD-Concrete | 12/23/2019 | 12/23/2019 | 12/23/2019 4:32:49 PM | P | PEND |
|
|
This inspection is for Slab preparation to include welded wire and thickened opening pour throughs. Will be ready by 3:00 pm today. MTI will be inspecting and observing placement at 6:00 am Tomorrow.
Thank You, have a great day. Phone #: ###-#### Inspection requested via web by Ron Oswald// slab area ok when ready after raising rebar// pending special inspection
|
BLD19-02849
| BLD-Conference | 12/23/2019 | 12/23/2019 | 12/23/2019 4:10:09 PM | P | PEND |
|
|
verify rear setbacks,, measures 15 foot from wood frame to existing fence sent photos to Tom in Code enforcement
|
BLD19-01860
| BLD-Energy code compliance | 12/20/2019 | 12/23/2019 | 12/23/2019 3:22:22 PM | P | PASS |
|
|
Craig Phone #: ###-####,, will need interior shear inspection,, ok to cover after adding truss brace where cut out
|
BLD19-01860
| BLD-Framing/Rough-in | 12/20/2019 | 12/23/2019 | 12/23/2019 3:21:23 PM | P | PART |
|
|
Craig Phone #: ###-####,, needs truss brace added that was cut out at the top of stairs,, will need interior shear inspection also
|
BLD19-03053
| BLD-Framing/Rough-in | 12/23/2019 | 12/23/2019 | 12/23/2019 2:20:38 PM | P | PART |
|
|
Ryan - call for access Phone #: ###-####// ok to insulate,, see paint for c/n,, fire block,, insulate rim areas,, headroom on the stairs, etc
|
BLD19-03485
| BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 12:39:36 PM | A | PART |
|
|
Austin Phone #: ###-####// upper level of home footings
|
BLD19-03484
| BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 12:39:21 PM | A | PART |
|
|
Austin Phone #: ###-####// upper level of home footings
|
BLD19-03483
| BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 12:39:09 PM | A | PART |
|
|
Austin Phone #: ###-####// upper level of home footings
|
BLD19-03482
| BLD-Foundation | 12/20/2019 | 12/23/2019 | 12/23/2019 12:38:54 PM | A | PART |
|
|
Austin Phone #: ###-####.. upper level of home footings
|
BLD19-04362
| BLD-Footing | 12/19/2019 | 12/23/2019 | 12/23/2019 12:36:47 PM | A | PART |
|
|
Curtis Phone #: ###-####,, main footings ok except the east retaining wall footing,, engineering changed,, need to redo per newer engineering
|
BLD19-03085
| BLD-Wall Bracing | 12/20/2019 | 12/23/2019 | 12/23/2019 11:29:26 AM | A | PASS |
|
|
Larry Phone #: ###-####,, exterior ok after adding minor nailing and finishing straps
|
BLD18-03249
| BLD-Conference | 12/20/2019 | 12/23/2019 | 12/23/2019 11:05:14 AM | A | PART |
|
|
Fabian Phone #: ###-####,, walk through on the final,, needs hillside PW pass,, needs guard rail and hand rail to meet code,, needs fire seperation in the garage..
|