BLD06-02899
| Extend Permit 180 days | 12/21/2007 | 12/21/2007 | | P | |
|
|
|
FIR07-00937
| INSP-Sprinkler Rough-in | 12/24/2007 | 12/24/2007 | 12/24/2007 12:41:06 PM | P | PART |
|
|
OH hydrostatic retest completed and passed per inspection done 12/21. No access provided to perform inspection for cover at the third floor today, noted insulation at the third floor does not appear to be finished at this time.
|
FIR07-01022
| INSP-Conference | 12/21/2007 | 12/24/2007 | 12/24/2007 12:36:44 PM | A | DONE |
|
|
On site visit regarding heat and SD device locations at the elevator penthouse, hoistway and pit areas.
|