BLD14-03406
| BLD-Final | 12/23/2014 | 12/24/2014 | 12/24/2014 2:48:32 PM | P | NR |
|
|
Brad Phone #: ###-#### needs fire finals
|
BLD12-02886
| BLD-Ceiling Grid Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 2:47:54 PM | P | PASS |
|
|
Kent Phone #: ###-#### 3rd and 4th fl corr
|
BLD14-02793
| BLD-Footing | 12/23/2014 | 12/24/2014 | 12/24/2014 12:17:52 PM | A | PEND |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron crew needs to spin footing 90 degs it needs to be a side loader
|
BLD14-02003
| BLD-Foundation | 12/23/2014 | 12/24/2014 | 12/24/2014 12:15:19 PM | A | PEND |
|
|
Partial Masonary wall grout/rebar,MTI scheduled to be onside 11am grout Phone #: ###-#### Inspection requested via web by Murph Naughtin
|
GCB14-00152
| GCB-Fndatn/slab ins/fld vent | 12/23/2014 | 12/24/2014 | 12/24/2014 12:14:50 PM | A | PASS |
|
|
Block and Tie for manufacutred home Randy ###-####
|
GCB14-00067
| GCB-Final | 12/23/2014 | 12/24/2014 | 12/24/2014 9:39:29 AM | A | PASS |
|
|
Vu ###-#### - call ahead
|
BLD14-01868
| BLD-Conference | 12/23/2014 | 12/24/2014 | 12/24/2014 9:15:51 AM | A | PASS |
|
|
Look at framing and Sheetrock inside of hood duct shaft. Phone #: ###-#### Inspection requested via web by Chris Eby
|
BLD14-01868
| BLD-Ceiling Grid Inspection | 12/23/2014 | 12/24/2014 | 12/24/2014 9:15:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Eby
|
BLD14-03058
| BLD-Wall Bracing | 12/23/2014 | 12/24/2014 | 12/24/2014 8:47:54 AM | A | PASS |
|
|
|
BLD14-03199
| BLD-Energy code compliance | 12/24/2014 | 12/24/2014 | 12/24/2014 8:47:39 AM | A | PASS |
|
|
|
BLD14-03199
| BLD-Framing/Rough-in | 12/23/2014 | 12/24/2014 | 12/24/2014 8:47:24 AM | A | PASS |
|
|
Tenji Phone #: ###-####
|