ESC14-00614
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 3:14:27 PM | | PASS |
|
|
No activity. No ESC corrections at this time.
|
ESC14-00135
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 2:53:24 PM | | PASS |
|
|
|
ESC14-01044
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 2:44:08 PM | P | PART |
|
|
Correction needed: remove stockpile off sidewalk and provide perimeter sediment containment along the sidewalk in addition to stabilized entrance.
Permit posted. No sediment runoff down hill from site or hillside erosion occuring.
|
ESC14-00289
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 12:09:03 PM | | PASS |
|
|
Occupied. Still needs revegetation. BLD already finaled. no corrections. DI still installed.
|
ESC14-00284
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 12:03:50 PM | | PASS |
|
|
BLD and home is now occupied. Bond issued for hillside revegetation - will probably wait for spring. Sidewalks and streets have been cleaned. Perimeter wattles on back of house at Draco have been reinstalled and gravel walkway installed to prevent trackout. ESC permit will stay open till stabilzation/revegetation.
|
ESC13-00684
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 11:59:59 AM | | PASS |
|
|
WIP. No corrections needed at this time. No new erosion. culdesac is fairly clean. Downstream inlets properly protected.
|
ESC14-01022
| BMP Violation | 12/24/2014 | 12/24/2014 | 12/24/2014 11:53:51 AM | P | PASS |
|
|
Silt fence protecting the rocky drainage swale behind homesite has been repaired as requested. No other violations, correction complete.
|
ESC14-00608
| Random Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 11:47:17 AM | A | PART |
|
|
Two new drainage culverts were recently installed to improve drainage at site after large rain. The pipes discharge to the south side of Warm Springs to the cow pastures. Not connected to Warm Springs CreeK ->Boise River. Silt fence has be installed around the inlets to capture some sediment. No longer draining.
Designated stormwater settling ponds are still full and draining. The end of pipe discharge goes into the pasture and is still flowing. Water is very muddy but not going to a waterway.(land application). Ponds are not yet complete.
Correction: Need to clean up trackout on Greenbelt, Old Hickory and some of Warm Springs.
|
ESC13-00755
| Random Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 11:37:32 AM | A | PART |
|
|
Parking lots in staging area and west side parking lot have been cleaned up and have rock base installed to keep mud down. Much improved. Silt fence and DI protection in good condition.
Significant amount of loose sediment on Council Springs and surrounding area so still getting a lot of trackout of sediment from the the west entrance to Terraces.
Sweeper was onsite, but site still needs to continue to make changes to prevent trackout.
|
ESC14-00231
| Aging Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 10:44:09 AM | | PASS |
|
|
Project complete. Yard is landscaped and stabilized. No construction materials or loose sediment. ESC permit finaled.
|
ESC14-00231
| DOC - Permit Finaled | 12/24/2014 | 12/24/2014 | 12/24/2014 10:43:32 AM | P | PASS |
|
|
|
ESC14-00696
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 9:13:28 AM | | PASS |
|
|
No activity. Site is surrounded by chain link fencing. No ESC issues.
|
ESC14-00693
| General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 8:47:54 AM | | PASS |
|
|
TI complete. No disturbed area or building materials remaining at site. ESC permit conditions satisfied.
|
ESC14-00693
| DOC - Permit Finaled | 12/24/2014 | 12/24/2014 | 12/24/2014 8:47:06 AM | P | PASS |
|
|
|