Inspections for the day of: Wednesday, December 24, 2014.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00614 General Inspection12/24/201412/24/201412/24/2014 3:14:27 PM PASS
No activity. No ESC corrections at this time.
ESC14-00135 General Inspection12/24/201412/24/201412/24/2014 2:53:24 PM PASS
ESC14-01044 General Inspection12/24/201412/24/201412/24/2014 2:44:08 PMPPART
Correction needed: remove stockpile off sidewalk and provide perimeter sediment containment along the sidewalk in addition to stabilized entrance.

Permit posted. No sediment runoff down hill from site or hillside erosion occuring.
ESC14-00289 General Inspection12/24/201412/24/201412/24/2014 12:09:03 PM PASS
Occupied. Still needs revegetation. BLD already finaled. no corrections. DI still installed.
ESC14-00284 General Inspection12/24/201412/24/201412/24/2014 12:03:50 PM PASS
BLD and home is now occupied. Bond issued for hillside revegetation - will probably wait for spring. Sidewalks and streets have been cleaned. Perimeter wattles on back of house at Draco have been reinstalled and gravel walkway installed to prevent trackout. ESC permit will stay open till stabilzation/revegetation.
ESC13-00684 General Inspection12/24/201412/24/201412/24/2014 11:59:59 AM PASS
WIP. No corrections needed at this time. No new erosion. culdesac is fairly clean. Downstream inlets properly protected.
ESC14-01022 BMP Violation12/24/201412/24/201412/24/2014 11:53:51 AMPPASS
Silt fence protecting the rocky drainage swale behind homesite has been repaired as requested. No other violations, correction complete.
ESC14-00608 Random Inspection12/24/201412/24/201412/24/2014 11:47:17 AMAPART
Two new drainage culverts were recently installed to improve drainage at site after large rain. The pipes discharge to the south side of Warm Springs to the cow pastures. Not connected to Warm Springs CreeK ->Boise River. Silt fence has be installed around the inlets to capture some sediment. No longer draining.

Designated stormwater settling ponds are still full and draining. The end of pipe discharge goes into the pasture and is still flowing. Water is very muddy but not going to a waterway.(land application). Ponds are not yet complete.

Correction: Need to clean up trackout on Greenbelt, Old Hickory and some of Warm Springs.
ESC13-00755 Random Inspection12/24/201412/24/201412/24/2014 11:37:32 AMAPART
Parking lots in staging area and west side parking lot have been cleaned up and have rock base installed to keep mud down. Much improved. Silt fence and DI protection in good condition.

Significant amount of loose sediment on Council Springs and surrounding area so still getting a lot of trackout of sediment from the the west entrance to Terraces.

Sweeper was onsite, but site still needs to continue to make changes to prevent trackout.
ESC14-00231 Aging Inspection12/24/201412/24/201412/24/2014 10:44:09 AM PASS
Project complete. Yard is landscaped and stabilized. No construction materials or loose sediment. ESC permit finaled.
ESC14-00231 DOC - Permit Finaled12/24/201412/24/201412/24/2014 10:43:32 AMPPASS
ESC14-00696 General Inspection12/24/201412/24/201412/24/2014 9:13:28 AM PASS
No activity. Site is surrounded by chain link fencing. No ESC issues.
ESC14-00693 General Inspection12/24/201412/24/201412/24/2014 8:47:54 AM PASS
TI complete. No disturbed area or building materials remaining at site. ESC permit conditions satisfied.
ESC14-00693 DOC - Permit Finaled12/24/201412/24/201412/24/2014 8:47:06 AMPPASS