ELE18-04821
| Permanent Service | 12/24/2018 | 12/24/2018 | 12/24/2018 3:58:50 PM | P | PASS |
|
|
correction complete, p/s o/h rec ok
|
ELE18-04821
| Permanent Service | 12/23/2018 | 12/24/2018 | 12/24/2018 12:59:03 PM | A | FAIL |
|
|
I would like to get an ok to hook up to Idaho power. we are trying to get this over to Idaho power so they can get the power transfer done by the end of this week. Thanks Todd Phone #: ###-#### Inspection requested via web by todd cline NEC 230.28(A) Service Masts as Supports (A) Strength. The service mast shall be of adequate strength or be supported by braces or guides to withstand safely the strain imposed by the service-drop or overhead conductors. Under sized service mast, Idaho Power overhead service requirements states Use a minimum of 2" conduit for service masts. Masts that penetrate a roof must be rigid steel. EMT or Schedule 80 PVC may be used below a roof. NEC 90.7 Guide kit attached to roof inadequatly installed with sheet metal screws
|
ELE18-04627
| Rough-In Permanent Service | 12/21/2018 | 12/24/2018 | 12/24/2018 11:01:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in p/s u/g n ok
|
ELE18-04110
| Final | 12/21/2018 | 12/24/2018 | 12/24/2018 8:45:30 AM | A | NH |
|
|
Richard Phone #: ###-#### Nobody home, No answer by phone, call back in for reinpection
|