Inspections for the day of: Wednesday, December 26, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-000-1 BLD-Aging Inspection12/26/200112/26/200112/26/2001 12:00:00 AM NR
apts, wip. 12/26/2001 9:33:46 AM
BLD00-03729 BLD-Conference12/26/200112/26/200112/26/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 12/26/2001 9:32:51 AM w/ mason re spec insps.
MEC01-03844 Conference12/26/200112/26/200112/26/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 12/26/2001 10:42:06 AM w/ Randy of RM mechanical...recommend consult w/ 350 re final this permit (press. test by gas co.?) at Boise Tower.
BLD01-01993 BLD-Framing/Rough-in12/21/200112/26/200112/26/2001 12:00:00 AMAPART
RICK ###-#### "west" entry roof framing ok to cover. 12/26/2001 10:43:25 AM
BLD01-02724 BLD-Wall cover12/26/200112/26/200112/26/2001 12:00:00 AMPPART
###-####...walls ok 12/26/2001 2:26:37 PM
MEC01-03863 Pressure Test12/26/200112/26/200112/26/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/26/2001 at 09:38:38. Contact: ###-####...p.t. ok 12/26/2001 2:37:24 PM
MEC01-02893 Pressure Test12/26/200112/26/200112/26/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/26/2001 at 10:19:29. Contact: ###-####...need diagram, not onsite 12/26/2001 4:47:39 PM
BLD01-02771 BLD-Final12/26/200112/26/200112/26/2001 12:00:00 AMPPASS
###-####, firesafing installed 12/26/2001 1:49:27 PM
BLD00-00153 BLD-Final12/26/200112/26/200112/26/2001 12:00:00 AMPFAIL
###-#### unable to view plans due to facility mgr's illness, recall. 12/26/2001 3:56:20 PM
BLD01-02791 BLD-Framing/Rough-in12/26/200112/26/200112/26/2001 12:00:00 AMPPART
###-####