MIS01-00166
| MIS-Aging Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | | PART |
|
|
no inspections called for. 12/26/2001 9:27:31 AM
|
MEC01-03039
| Final | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | FAIL |
|
|
left c/n to provide access to crawl space , IE: handle to get lid up. 12/26/2001 10:33:35 AM
|
MEC01-03756
| Pressure Test | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 12:47:58. Contact: ###-####. No one home. 12/26/2001 11:27:15 AM
|
MEC01-03831
| Pressure Test | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | NR |
|
|
###-####. Still installing gas pipe. 12/26/2001 10:01:26 AM
|
BLD01-02789
| BLD-Framing/Rough-in | 12/25/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/25/2001 at 19:46:15. Contact: ###-####.c/n posted. 12/26/2001 11:10:15 AM
|
MEC01-03788
| Pressure Test | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 09:11:53. Contact: ###-####.
|
MEC01-03788
| Final | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 09:12:06. Contact: ###-####.
|
BLD01-02883
| BLD-Framing/Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 11:24:12. Contact: ###-####.Needs electrical permit and inspection,also needs mec inspection also foam seal not done. c/n posted. 12/26/2001 3:26:39 PM
|