BLD01-02621
| BLD-Aging Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | | PASS |
|
|
|
BLD01-02917
| BLD-Framing/Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 07:08:31. Contact: ###-####.
|
MEC01-03194
| Final | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | PASS |
|
|
|
BLD01-03153
| BLD-Framing/Rough-in | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | NR |
|
|
###-####
|
BLD01-02931
| BLD-Framing/Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 425 On 12/26/2001 9:18:49 AM shear ok to cover ext
|
BLD01-02558
| BLD-Final | 12/20/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | FAIL |
|
|
###-#### please call dana before going to job site need smoke detecto r and landing on back stairs 12/26/2001 4:50:45 PM 12/26/2001 4:51:05 PM
|
BLD00-02851
| BLD-Final | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
julie ###-#### fn ok for perm occ . after planning and zoning sing off perm 12/26/2001 12:28:02 PM
|
MEC01-03862
| Rough-in | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-03862
| Pressure Test | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-02736
| Final | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 10:16:53. Contact: ###-####.c/n on site 12/26/2001 1:13:26 PM
|