BLD00-02793
| FIRE-Final Inspection | 12/21/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | A | PASS |
|
|
Fire life/safety finaled 12/26/2001 2:30:07 PM
|
BLD01-02423
| FIRE-Final Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | CANC |
|
|
canceled by contractor. To be rescheduled 12/26/2001 1:32:32 PM
|
BLD01-02862
| FIRE-Final Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | PASS |
|
|
Fire life/safety finaled. Exterior door hardware to be verified by structural inspector 12/26/2001 11:35:33 AM
|
FIR01-00562
| INSP-Sprinkler Rough-in/Hydro | 12/26/2001 | 12/26/2001 | 12/26/2001 12:00:00 AM | P | NR |
|
|
Underground pipe flange wouldn't hold pressure 12/26/2001 3:20:34 PM
|