BLD02-00022
| BLD-Aging Inspection | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | | NR |
|
|
final pending ele sign off. 12/26/2002 8:50:27 AM
|
BLD02-00085
| BLD-Aging Inspection | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | | NR |
|
|
final pending ele sign off 12/26/2002 8:51:39 AM
|
BLD00-03428
| BLD-Framing/Rough-in | 12/10/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | A | FAIL |
|
|
wip 3 rd floor top of corrordor gyp/ hydronic pipe fire stopping./ visqueen listing. 12/26/2002 10:39:48 AM
|
BLD02-02292
| BLD-Framing/Rough-in | 12/23/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 17:02:23. Contact: ###-####. c/n made ok. 12/26/2002 3:38:00 PM
|
BLD02-02993
| BLD-Footing | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson wip size and setbacks ok, 12/26/2002 2:17:04 PM
|