PLM02-03008
| Final | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/26/2002 at 08:54:25. Contact: ###-####. final ok 12/26/2002 2:07:23 PM
|
PLM02-03863
| Water and/or Sewer | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | P | PASS |
|
|
DAN ###-#### sw final ok 12/26/2002 1:45:04 PM
|
PLM02-03656
| Plumbing Rough-in | 12/26/2002 | 12/26/2002 | 12/26/2002 12:00:00 AM | P | PASS |
|
|
checked out the rework to satisfy the fire code everything looked ok
|