Inspections for the day of: Thursday, December 26, 2019.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04505 BLD-Final12/23/201912/26/201912/26/2019 4:39:45 PMPFAIL
Phone #: ###-#### Inspection requested via web by BRS Permitting//no access from Alpine St, went to back alley, gate is locked and no access//
BLD19-03789 BLD-Foundation12/24/201912/26/201912/26/2019 4:38:56 PMPPASS
Jerry Phone #: ###-####//per plans//
BLD18-02183 BLD-Aging Inspection12/26/201912/26/201912/26/2019 3:31:47 PM CANC
BLD16-00703 BLD-Aging Inspection12/26/201912/26/201912/26/2019 3:30:59 PM CANC
BLD17-00258 BLD-Aging Inspection12/26/201912/26/201912/26/2019 3:25:21 PM DONE
Expires: 02/10/20
BLD18-02940 BLD-Aging Inspection12/26/201912/26/201912/26/2019 3:24:26 PM DONE
Expires: 02/10/20
BLD18-01690 BLD-Aging Inspection12/26/201912/26/201912/26/2019 3:23:55 PM DONE
Expires: 02/09/20
BLD19-02965 BLD-Framing/Rough-in12/26/201912/26/201912/26/2019 3:10:46 PMPPASS
chad Phone #: ###-####//floor ok to insulate and cover per Jim on 10/2/19//walls existing//ok to insulate with mechanical approval//electrical, plumbing approved//
BLD19-04834 BLD-Framing/Rough-in12/26/201912/26/201912/26/2019 2:21:38 PMPPASS
trades ok//add fireblocking at concealed space//ok to cover//
BLD19-04834 BLD-Final12/26/201912/26/201912/26/2019 2:20:15 PMPCANC
###-#### Brian after 1:30 please//need framing//
BLD19-04169 BLD-Wall Bracing12/26/201912/26/201912/26/2019 1:17:25 PMPPASS
exterior shear--ok when second story is stapled in locations discussed--working on it//nails added at sill plate//
BLD19-00323 BLD-Framing/Rough-in12/26/201912/26/201912/26/2019 12:21:27 PMPCANC
metal stem wall // Kent Phone #: ###-####/ Ken had questions on demising wall--plans show to underside of roof sheathing--wall stops at roof insulation--refered him to architect//some walls have been one sided--asked him to leave uncovered until all trades passed and framing is approved//
BLD19-00326 BLD-Framing/Rough-in12/26/201912/26/201912/26/2019 12:21:06 PMPNR
metal stem wall // Kent Phone #: ###-####// Ken had questions on demising wall--plans show to underside of roof sheathing--wall stops at roof insulation--refered him to architect//some walls have been one sided--asked him to leave uncovered until all trades passed and framing is approved//
BLD19-00646 BLD-Footing12/23/201912/26/201912/26/2019 11:27:00 AMANR
We are doing a monolithic pour for a small sunroom/greenhouse addition and are ready for our initial inspection. I live in Caldwell so If I have a general idea when you might be able th get there, I can head out in good time. Thanks. Steve Phone #: ###-#### Inspection requested via web by Steve Herring//Steve will call in when day of or before pour--due to cold weather concrete provisions//
BLD19-04325 BLD-Final12/24/201912/26/201912/26/2019 11:03:33 AMAFAIL
Thank you! Phone #: ###-#### Inspection requested via web by Candyce Moss//no one home, no plans onsite//
BLD19-04179 BLD-Wall Bracing12/26/201912/26/201912/26/2019 10:35:23 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle//ok when top osb strips are installed and nailed to top plate--full length or walls for CS-WSP
BLD19-04169 BLD-Wall Bracing12/25/201912/26/201912/26/2019 10:17:22 AMANR
Phone #: ###-#### Inspection requested via web by Joel Hirtle//not ready will call in when ready//
BLD19-01956 BLD-Framing/Rough-in12/24/201912/26/201912/26/2019 9:47:13 AMAPASS
David Phone #: ###-####
BLD19-01957 BLD-Framing/Rough-in12/24/201912/26/201912/26/2019 9:46:27 AMAPASS
David Phone #: ###-####
MIS19-00345 Set Bond Amount12/11/201912/26/201912/26/2019 7:38:11 AMPCANC
MIS18-00447 DOC - Permit Finaled12/26/201912/26/201912/26/2019 7:32:56 AMPPASS