ELE99-03997
| Electrical Rough-In | 12/22/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | A | PART |
|
|
Flloyd Detering ###-####. Partial R/I ok.
|
ELE99-04558
| Final | 12/23/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/23/1999 at 08:13:16. Contact: ###-####. Drive ground rods flush and use mach. screws for grounding.
|
ELE99-04578
| Temporary Service | 12/27/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | P | PASS |
|
|
ALAN ###-####. T/S ok final.
|
ELE99-04579
| Temporary Service | 12/27/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | P | PASS |
|
|
ALAN ###-####. T/S ok final.
|
ELE99-03725
| Final | 12/27/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 10:54:52. Contact: ###-####. Final ok.
|
ELE99-04563
| Final | 12/27/1999 | 12/27/1999 | 12/27/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 10:56:29. Contact: ###-####. Covered without R/I inspection.
|