Inspections for the day of: Monday, December 27, 1999.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-04150 Final12/23/199912/27/199912/27/1999 12:00:00 AMACANC
kevin ###-####. Trans to 337.
MEC99-02594 Final12/23/199912/27/199912/27/1999 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/23/1999 at 11:43:32. Contact: ###-####. Adams Elementary School, unable to reach contact?
MEC99-02595 Final12/23/199912/27/199912/27/1999 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/23/1999 at 11:44:33. Contact: ###-####. Unable to reach contact. Longfellow elementar school.
MEC99-02596 Final12/23/199912/27/199912/27/1999 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/23/1999 at 11:45:30. Contact: ###-####. Roosevelt Elementary School, unable to reach contact.
MEC99-02771 Final12/23/199912/27/199912/27/1999 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/23/1999 at 11:46:24. Contact: ###-####. Washington Elementary School, unable to reach contact.
MEC99-03958 Final12/23/199912/27/199912/27/1999 12:00:00 AMAPASS
NIKKI ###-#### RE-INSP FN. Done by 316.
BLD99-03015 BLD-Concrete12/23/199912/27/199912/27/1999 12:00:00 AMAPASS
###-####. Masonry wall.
MEC99-04337 Rough-in12/23/199912/27/199912/27/1999 12:00:00 AMAPASS
###-####. Done by 316.
MEC99-03778 Final12/27/199912/27/199912/27/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/27/1999 at 08:19:37. Contact: ###-####.
BLD99-03428 BLD-Framing/Rough-in12/27/199912/27/199912/27/1999 12:00:00 AMPPASS
SHEAR WALL ED ###-####. OK to side.
BLD99-03434 BLD-Wall cover12/27/199912/27/199912/27/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/27/1999 at 09:29:44. Contact: ###-####. Ok to side, need to check engineers detail at inside of foundation wall for the anchoring of retro- hold downs.
MEC99-04340 Rough-in12/27/199912/27/199912/27/1999 12:00:00 AMPFAIL
###-#### AS LATE TODAY AS POSSIBLE. Called about corrections flue pipe/ gas test.
BLD99-03101 BLD-Footing12/27/199912/27/199912/27/1999 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/27/1999 at 11:06:23. Contact: ###-####.CANC BY BILL. Excavation has not been done.
MEC99-04253 Final12/21/199912/27/199912/27/1999 12:00:00 AMPFAIL
###-####. Combustion air/ 6" clearance single wall.