Inspections for the day of: Wednesday, December 27, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01261 BLD-Framing/Rough-in12/26/200012/27/200012/27/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/26/2000 at 10:51:02. Contact: ###-####. hold downs insp and in place special insp. feild report aproved for embedment length of rod and king stud atchment per listing of holddowns.other idems on c/n out standing. 12/27/2000 3:04:47 PM
BLD00-03143 BLD-Framing/Rough-in12/26/200012/27/200012/27/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/26/2000 at 14:59:29. Contact: ###-####. roof decking work in progess/pudel welding not ready for inspect/ need engineer proceger for ut of full pen welds with backer bars left in place/ recieved special insp. scope of work. 12/27/2000 11:53:33 AM
BLD00-01563 BLD-Foundation11/27/200012/27/200012/27/2000 12:00:00 AMAPART
joe ###-#### found- tressel work in progess covered with special insp. 12/27/2000 10:59:58 AM
BLD00-01427 BLD-Final12/26/200012/27/200012/27/2000 12:00:00 AMAPASS
###-#### l/c ok final ok card with micron doc. control. 12/27/2000 9:25:36 AM
BLD00-03581 BLD-Framing/Rough-in12/27/200012/27/200012/27/2000 12:00:00 AMPPASS
DAN ###-#### RE-BAR steve web aproved for cover am. 12/27/2000 2:17:20 PM
BLD00-01563 BLD-Concrete12/26/200012/27/200012/27/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/26/2000 at 07:04:43. Contact: ###-####. tressel steel fram on site from fabracator bolting and weld conection in progess as well as piping supports to first truss. work in progess. 12/27/2000 3:27:22 PM
BLD00-01867 BLD-Framing/Rough-in12/26/200012/27/200012/27/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/26/2000 at 15:09:58. Contact: ###-####. conf. with haedgrove and richardson to review roof details/ const. covered with special insp. pending reports for welding/ 12/27/2000 4:20:31 PM
BLD99-03148 BLD-Final12/26/200012/27/200012/27/2000 12:00:00 AMPCANC
###-#### temp occ fire insp failled not ready for insp. until fire approved. 12/27/2000 4:22:07 PM