BLD01-03113
| BLD-Conference | 12/27/2001 | 12/27/2001 | 12/27/2001 12:00:00 AM | | PASS |
|
|
refer to ele01-04260
|
ELE01-03581
| Final | 12/26/2001 | 12/27/2001 | 12/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 13:21:37. Contact: ###-####. conference - jms/mk 12/27/2001 8:50:52 AM
|
ELE01-02083
| Electrical Rough-In | 12/27/2001 | 12/27/2001 | 12/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 08:16:26. Contact: ###-####. remove all tiles before call next call 12/27/2001 10:55:14 AM
|
ELE01-04245
| Electrical Rough-In | 12/27/2001 | 12/27/2001 | 12/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 08:26:26. Contact: ###-####. interior walls - ok 12/27/2001 11:25:09 AM
|
ELE01-03868
| Electrical Rough-In | 12/27/2001 | 12/27/2001 | 12/27/2001 12:00:00 AM | P | PASS |
|
|
ceiling cover insp- mark ###-####
|