Inspections for the day of: Wednesday, December 27, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00853 INSP-Sprinkler Rough-in12/26/200612/27/200612/27/2006 4:18:25 PMPPASS
Need vault cover and forward flush
BLD06-03193 FIRE-Final Inspection12/27/200612/27/200612/27/2006 4:11:28 PMPPASS
Life safety finaled
FIR06-00779 INSP-Sprinkler Rough-in12/27/200612/27/200612/27/2006 3:35:27 PMPPASS
The sprinkler piping located above the hard lid in the retail area is ok to cover
BLD06-00100 FIRE-Final Inspection12/27/200612/27/200612/27/2006 3:03:45 PMPFAIL
Three of the four door need adjusting for self closure, provide apartment numbers. The smoke detector in the east bedroom of the first floor north apartment does not sound clearly and I was unable to test the smoke detector in the vaulted ceiling of the second floor south apartment.
BLD06-03007 FIRE-Final Inspection12/27/200612/27/200612/27/2006 2:04:56 PMPPASS
life safety finaled
BLD05-02073 FIRE-Conference12/26/200612/27/200612/27/2006 11:25:11 AMADONE
Contractor wanted to "turn over" several rooms to St. Als for use. I stated that I would not be ok with that because the egress corridor from these rooms would have an inoperative fire alarm system.
FIR06-00631 FIR-Aging Inspection12/27/200612/27/200612/27/2006 11:22:55 AM NR
work is in progress
BLD06-00169 FIRE-Final Inspection12/26/200612/27/200612/27/2006 9:55:27 AMAPASS
life safety finaled
BLD06-02180 FIRE-Final Inspection12/26/200612/27/200612/27/2006 9:55:05 AMAPASS
Life safety finaled
FIR06-00491 INSP-Final Inspection12/27/200612/27/200612/27/2006 9:39:32 AMPCANC
mike; Note: 11:00 amPhone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Patricia Smith
FIR06-00710 INSP-Final Inspection12/26/200612/27/200612/27/2006 9:38:47 AMACANC
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIR06-00710 INSP-Sprinkler Rough-in/Hydro12/26/200612/27/200612/27/2006 9:38:18 AMAFAIL
Hydro test failed due to new heads needing added. Atleast one head is needed on the east side of the riser room and another to provide column protection per Chapter 12. Provide flexible couplings for the 4" riser piping at the racks. I notified the general contractor that there can be no storage below the stairs or sprinkler protection will be required. Also there are many screws for the rack piping hangers that are not ran all the way into the supporting structure.