BLD13-02296
| FIRE-Conference | 12/27/2013 | 12/27/2013 | 12/27/2013 4:13:47 PM | P | DONE |
|
|
Regarding project related fire life safety inspection items.
|
FIR13-00308
| INSP-Sprinkler Rough-in | 12/26/2013 | 12/27/2013 | 12/27/2013 4:10:41 PM | A | PART |
|
|
Okay to cover fire sprinkler work at the second floor north end stairway grid ceiling.
|
FIR13-00710
| INSP-Sprinkler Rough-in | 12/26/2013 | 12/27/2013 | 12/27/2013 1:23:01 PM | A | PART |
|
|
Overhead rough-in and system modifications passed inspection.
|
BLD13-02346
| FIRE-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 12:08:58 PM | A | PASS |
|
|
Fire life safety passed pending one exit sign is added at the NE corner per approved plans.
|
FIR13-00543
| INSP-Final Inspection | 12/24/2013 | 12/27/2013 | 12/27/2013 12:07:02 PM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
BLD13-02394
| FIRE-Final Inspection | 12/26/2013 | 12/27/2013 | 12/27/2013 12:06:14 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|