PLM95-01370
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/29/1995 12:00:00 AM | P | PASS |
|
|
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01409
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01299
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1W/H 1 L/T
|
PLM95-01299
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1W/H 1 L/T
|
PLM95-01299
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1W/H 1 L/T
|
PLM95-01299
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1W/H 1 L/T
|
PLM95-01370
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 3 BASIN 4 TUB 3 SHR 1 SINK 1 W/B 1 W/S 1 L/T 1
|
PLM95-01370
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 3 BASIN 4 TUB 3 SHR 1 SINK 1 W/B 1 W/S 1 L/T 1
|
PLM95-01370
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 3 BASIN 4 TUB 3 SHR 1 SINK 1 W/B 1 W/S 1 L/T 1
|
PLM95-01370
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 3 BASIN 4 TUB 3 SHR 1 SINK 1 W/B 1 W/S 1 L/T 1
|
PLM95-01826
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 SHR 2
|
PLM95-01826
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 SHR 2
|
PLM95-01826
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 SHR 2
|
PLM95-01826
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 SHR 2
|
PLM95-02005
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02005
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02005
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02005
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02012
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02012
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02012
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-02012
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM95-01807
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1
|
PLM95-01653
| INSP - Plumbing Rough-in | 12/27/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | A | PASS |
|
|
12/27/95 347 - 12 FIXTURES REINSPECTION CORRECTION MADE OK W/C 3 BASIN 4 TUB 2 SINK 1 W/B 1 W/H 1
|
PLM95-01654
| INSP - Plumbing Rough-in | 12/27/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | A | FAIL |
|
|
12/27/95 347 - W/C 3 BASIN 4 TUB 2 SINK 1 W/B 1 W/H 1 break under slab
|
PLM95-01299
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | P | PASS |
|
|
|
PLM95-01826
| INSP - Final | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | P | PASS |
|
|
DOOR WILL BE OPEN
|
PLM95-02005
| INSP - Sewer and Water lines | 12/28/1995 | 12/28/1995 | 12/28/1995 12:00:00 AM | P | PASS |
|
|
AFTER 2:00
|