BLD98-02989
| INSP - Energy code compliance | 12/23/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | A | PART |
|
|
STEVE ###-#### ENERGY CODE INSP need insul rim & gar lid.
|
BLD98-03282
| INSP - Energy code compliance | 12/24/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | A | PART |
|
|
RICHARD ###-####...342 job, part ok to cover upper fl. only...need verify other r/i's at basement. remove duct openings at gar or add fire dampers.
|
BLD98-03313
| INSP - Final | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [8692072]. unable to contact, referred to 338.
|
MEC98-04323
| INSP - Framing/ Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | PART |
|
|
342 area, remove heat ducts at gar, etc. gas test & r/i previously done by wes.
|
MEC98-04431
| INSP - Framing/ Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | PASS |
|
|
SABRINA ###-#### r/i ok
|
BLD98-00377
| INSP - Final | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | PASS |
|
|
lc issued ###-####
|
BLD98-02396
| INSP - Foundation | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | FAIL |
|
|
Clint ###-#### pouring at 9...301 area; called,unable to contact; check the note "pouring at 9", sounds like a done deal to me ( I didn't get insp. til 10:30 am.)
|
BLD98-02506
| INSP - Framing/Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | FAIL |
|
|
scott ###-#### sheer wall...c/n, need plans onsite, fasteners not to fracture sheathing, etc. 301 area.
|
BLD98-02508
| INSP - Framing/Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | FAIL |
|
|
sheer wall scott ###-####; no plans, c/n. 301 area.
|
BLD98-02509
| INSP - Framing/Rough-in | 12/28/1998 | 12/28/1998 | 12/28/1998 12:00:00 AM | P | FAIL |
|
|
scott ###-####\sheer wall...c/n, no plans. nails not to fracture sheathing, etc. 301 area.
|