Inspections for the day of: Thursday, December 28, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02224 BLD-Framing/Rough-in12/27/200012/28/200012/28/2000 12:00:00 AMAPART
###-#### wrong permit for shear nail ok to side 13300 engelman 12/28/2000 11:04:23 AM
BLD00-02850 BLD-Framing/Rough-in12/27/200012/28/200012/28/2000 12:00:00 AMAPASS
###-#### ok to insul 12/28/2000 10:25:40 AM
MEC00-04482 Rough-in12/27/200012/28/200012/28/2000 12:00:00 AMANH
Scheduled by a contractor via Hello! on 12/27/2000 at 12:06:12. Contact: ###-####. 12/28/2000 11:03:19 AM
BLD00-02232 BLD-Energy code compliance12/27/200012/28/200012/28/2000 12:00:00 AMPPASS
bill-- cell ###-#### insulation
MEC00-04469 Pressure Test12/28/200012/28/200012/28/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/28/2000 at 07:34:25. Contact: ###-####.
MEC00-04469 Final12/28/200012/28/200012/28/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/28/2000 at 07:35:00. Contact: ###-####. elec incomplete temp hook up for cold weather 12/28/2000 1:58:07 PM
BLD00-02995 BLD-Final12/28/200012/28/200012/28/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/28/2000 at 09:58:06. Contact: ###-####.
BLD00-03114 BLD-Footing12/28/200012/28/200012/28/2000 12:00:00 AMPPASS
FT INSP ROD-- ###-####
BLD00-03235 BLD-Framing/Rough-in12/28/200012/28/200012/28/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/28/2000 at 10:57:08. Contact: ###-####. ok to side 12/28/2000 1:15:15 PM