FIR00-00602
| INSP-Supply line flush | 12/28/2000 | 12/28/2000 | 12/29/2000 12:00:00 AM | P | NH |
|
|
mike-- ###-#### underground supply line tried calling but received no anaser 1/2/2001 8:34:09 AM
|
BLD00-02659
| FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/29/2000 12:00:00 AM | P | PART |
|
|
###-#### reinspection phil//// okay to occupy for only 12/31 1/2/2001 8:33:00 AM
|
BLD00-02658
| FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/29/2000 12:00:00 AM | P | PART |
|
|
phil ###-####/// okay to occupy for 12/31 only 1/2/2001 8:33:32 AM
|
FIR00-00630
| INSP-Supply line flush | 12/27/2000 | 12/28/2000 | 12/28/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 11:45:08. Contact: ###-####.
|
BLD00-02979
| FIRE-Sprinkler Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 12:00:00 AM | P | PART |
|
|
GREG-- PAGER 99710--PAGE WHEN ARRIVE -BLD #26/// part one of phase 2 okay 12/28/2000 3:01:35 PM
|
BLD00-01546
| FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/28/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 10:53:20. Contact: ###-####./// east door not openable from the inside with mag lock on 12/28/2000 1:29:47 PM
|
FIR00-00670
| INSP-Sprinkler Rough-in | 12/28/2000 | 12/28/2000 | 12/28/2000 12:00:00 AM | P | PASS |
|
|
R/I --BRIAN ###-####
|