BLD00-02793
| BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | NR |
|
|
###-####; need card onsite 12/28/2001 12:08:57 PM
|
BLD01-03086
| BLD-Other | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | NR |
|
|
ground frozen, cannot complete grading 12/28/2001 10:18:04 AM
|
BLD98-03705
| BLD-Concrete | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 13:35:30. Contact: .N.W. caisson, pend spec insp reports & eng's ok 12/28/2001 2:31:40 PM
|
MEC01-03813
| Rough-in | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 07:04:28. Contact: ###-####.
|
MEC01-03813
| Pressure Test | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 07:04:49. Contact: ###-####.
|
BLD01-00186
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 12/28/2001 12:15:23 PM elec ok for grid; complete firestops at 1hr & smoke walls, prior to tiles ...many missed
|
BLD00-03538
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
|
BLD00-03538
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
|
BLD00-03538
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
|
BLD01-03068
| BLD-Framing/Rough-in | 12/26/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 13:03:48. Contact: ###-####.....shaft ok. 12/28/2001 5:28:49 PM
|
BLD01-00186
| BLD-Other | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 09:20:57. Contact: ###-####....seal smoke barrier walls per 904, keep c/n 12/28/2001 5:10:42 PM
|
BLD00-03538
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
|
BLD00-03538
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
|
BLD01-02690
| BLD-Conference | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/28/2001 12:12:04 PM w/ bldr, need extiguisher tests
|
BLD00-01649
| BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | FAIL |
|
|
###-####...keep c/n, remove duct at 5th fl. s.w. stair enclosure. 12/28/2001 5:15:18 PM
|
BLD00-03729
| BLD-Concrete | 12/27/2001 | 12/28/2001 | 12/27/2001 12:00:00 AM | A | CANC |
|
|
concrete--jim-- ###-####--cancel per jim
|