PLM01-04234
| Plumbing Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 12/27/2001 5:28:45 PM
|
PLM01-03723
| Med/Gas Systems | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PART |
|
|
###-#### ###-#### start of 24 hr test 12/28/2001 11:42:15 AM
|
PLM01-04239
| Plumbing Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
r/i -kevin-- ###-####
|
PLM01-04188
| Plumbing Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
storrm drain-- -- carl-- ###-#### part of system installed but not tested yet ( masco want,s to test all system when completed) 12/28/2001 6:10:54 PM
|
PLM01-04174
| Water and/or Sewer | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
###-#### rex water line ok to cover on the sewer line need to turn abs y around so it goes with the direction of flow home owner to call when correction is made on sewer line 12/28/2001 6:06:26 PM
|
PLM01-04241
| Water and/or Sewer | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-04242
| Water and/or Sewer | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
###-#### ron
|