BLD01-00986
| BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 13:35:31. Contact: ###-####.c/n posted. 12/28/2001 1:02:14 PM
|
MEC01-03831
| Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-02678
| BLD-Framing/Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 15:35:46. Contact: ###-####.c/n posted. 12/28/2001 11:25:50 AM
|
MEC01-02820
| Final | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 15:47:15. Contact: ###-####.
|
BLD01-02789
| BLD-Framing/Rough-in | 12/27/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 19:32:31. Contact: ###-####.still need to fire block duct in the garage at top and bottom c/n posted. 12/28/2001 11:44:35 AM
|
MEC01-03881
| Rough-in | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
ARRON ###-####
|
MEC01-03881
| Pressure Test | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | FAIL |
|
|
c/n posted. 12/28/2001 2:48:15 PM
|
BLD01-01785
| BLD-Final | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
Ok temporary oc,needs all other signatures on card for a perm occupancy. Note ther are 3 permits for this job carwash,building/store and one for the fuel island. 12/28/2001 3:14:49 PM
|
BLD01-01784
| BLD-Final | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PART |
|
|
Ok for temporary oc, needs all other signatures on card for a perm oc ,note there are 3 permits on this job , carwash,builing/store and fuel island. 12/28/2001 3:16:02 PM
|
BLD00-02299
| BLD-Wall cover | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | PASS |
|
|
center units 12/28/2001 2:45:21 PM
|
BLD01-02591
| BLD-Final | 12/28/2001 | 12/28/2001 | 12/28/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 407 On 12/28/2001 2:45:49 PM . Needs plans that are legible,a scaled down faxed copy at site is not clear, also needs electrical and fire/life safety inspection. NOTE: this permit is for the canopy fuel island only separate permits are for the carwash and store, Also note this contractor is not the same one as for the other buildings. 12/28/2001 3:35:07 PM 12/28/2001 3:41:48 PM
|