Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01807 FIRE-Final Inspection12/28/200512/28/200512/28/2005 5:57:39 PMPPASS
c/n items are complete, inspection passed.
FIR05-00425 INSP-Sprinkler Rough-in/Hydro12/27/200512/28/200512/28/2005 2:54:09 PMPPART
Inspected dry system overhead at 1st floor, begin 24hr air test of 2nd and 3rd floors dry systems at 47psi each, missing two lines under HVAC 1st floor dry system.
FIR05-00697 INSP-Final Inspection12/28/200512/28/200512/28/2005 2:16:29 PMPPASS
Demo permit complete.
FIR05-00840 INSP-Sprinkler Rough-in12/28/200512/28/200512/28/2005 2:15:43 PMPPART
Overhead rough-in is good for cover at the drop ceiling areas in the TI space and the hard lid ceiling at the lobby, the corridor and restroom areas not complete at this time.
BLD05-03058 FIRE-Conference12/28/200512/28/200512/28/2005 2:12:46 PMPDONE
On site discussion regarding requirements for TI space occupancy on the 7th floor.
FIR05-00763 INSP-Final Inspection12/27/200512/28/200512/28/2005 11:38:00 AMAPASS
Fire alarm permit finaled.
BLD05-02003 FIRE-Final Inspection12/27/200512/28/200512/28/2005 9:51:16 AMAPASS
c/n items have been completed, life safety passed inspection.
BLD05-01807 FIRE-Final Inspection12/27/200512/28/200512/28/2005 9:37:42 AMAFAIL
Provide max occupant load sign as indicated on fire code review notes, the two posted building address numbers do not correspond (one is 3554 the other is 3556).
FIR05-00729 INSP-Final Inspection12/27/200512/28/200512/28/2005 9:09:28 AMAPASS
Fire sprinkler permit finaled.