Inspections for the day of: Thursday, December 28, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00824 FIRE-Final Inspection12/28/200612/28/200612/28/2006 3:48:28 PMPNR
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIR06-00513 INSP-Final Inspection12/28/200612/28/200612/28/2006 3:46:50 PMPPASS
UG fire supply line permit finaled.
FIR06-00661 INSP-Final Inspection12/28/200612/28/200612/28/2006 3:46:23 PMPPASS
Fire sprinkler passed final inspection, permit finaled.
FIR05-00695 INSP-Alarm Testing12/27/200612/28/200612/28/2006 3:45:49 PMPPART
8th floor FA testing performed today, noted the two HC accessible rooms (810 and 811) have non-functional strobe notification devices upon room smoke detection, door holders at the elevator lobby are not programmed, need visual inspection of dampers at two locations, the remainder of guest rooms and common corridor on this floor tested okay.
BLD06-02415 FIRE-Final Inspection12/27/200612/28/200612/28/2006 11:39:20 AMAFAIL
Need to provide current certification tags for the fire extinguishers, lower the mounting height of the PFE at the main exit, missing emergency lighting for the seating area as shown on approved plans.
FIR06-00760 INSP-Final Inspection12/27/200612/28/200612/28/2006 11:09:07 AMAPASS
Fire alarm work passed field inspection, permit finaled.