BLD06-00824
| FIRE-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 3:48:28 PM | P | NR |
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIR06-00513
| INSP-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 3:46:50 PM | P | PASS |
|
|
UG fire supply line permit finaled.
|
FIR06-00661
| INSP-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 3:46:23 PM | P | PASS |
|
|
Fire sprinkler passed final inspection, permit finaled.
|
FIR05-00695
| INSP-Alarm Testing | 12/27/2006 | 12/28/2006 | 12/28/2006 3:45:49 PM | P | PART |
|
|
8th floor FA testing performed today, noted the two HC accessible rooms (810 and 811) have non-functional strobe notification devices upon room smoke detection, door holders at the elevator lobby are not programmed, need visual inspection of dampers at two locations, the remainder of guest rooms and common corridor on this floor tested okay.
|
BLD06-02415
| FIRE-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 11:39:20 AM | A | FAIL |
|
|
Need to provide current certification tags for the fire extinguishers, lower the mounting height of the PFE at the main exit, missing emergency lighting for the seating area as shown on approved plans.
|
FIR06-00760
| INSP-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 11:09:07 AM | A | PASS |
|
|
Fire alarm work passed field inspection, permit finaled.
|