FIR06-00585
| FIR-Aging Inspection | 12/28/2006 | 12/28/2006 | 1/3/2007 3:58:31 PM | | NR |
|
|
work is in progress
|
FIR06-00710
| INSP-Final Inspection | 12/27/2006 | 12/28/2006 | 12/29/2006 4:00:18 PM | A | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the sprinkler design/aisle widths are figured out.
|
FIR06-00491
| INSP-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 5:04:08 PM | P | FAIL |
|
|
Need as-builts showing the deleted duct detector and revised zones, provide revized map at the facp and provide the NFPA 72 forms.
|
BLD06-02211
| FIRE-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 5:02:01 PM | A | FAIL |
|
|
Lower and tag fire extinguishers. Provide correct sample tubes and remote annunciators for the duct smoke detectors.
|
BLD06-02883
| FIRE-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 1:56:56 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00710
| INSP-Sprinkler Rough-in/Hydro | 12/27/2006 | 12/28/2006 | 12/28/2006 1:54:04 PM | A | FAIL |
|
|
The rack system overhead hydro test failed. All other items have been corrected. Forward flush passed.
|
FIR06-00878
| INSP-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 12:50:10 PM | P | PASS |
|
|
permit finaled
|
FIR06-00853
| INSP-Supply line flush | 12/27/2006 | 12/28/2006 | 12/28/2006 11:40:22 AM | A | PASS |
|
|
Forward flush passed.1,180 gallons was verified through a diffuser and a play pipe. Need lid for the vault for final.
|
FIR06-00738
| INSP-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 10:18:24 AM | A | PASS |
|
|
permit finaled
|
FIR06-01004
| INSP-Final Inspection | 12/27/2006 | 12/28/2006 | 12/28/2006 9:06:52 AM | A | PASS |
|
|
permit finaled
|