Inspections for the day of: Monday, December 28, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01812 BLD-Footing12/28/200912/28/200912/28/2009 5:00:21 PMPPASS
Dane Phone #: ###-####
ESC09-00597 Random Inspection12/28/200912/28/200912/28/2009 4:14:56 PMPPART
Talked to RP....Need to replace sign.
BLD09-01627 BLD-Framing/Rough-in12/28/200912/28/200912/28/2009 4:14:10 PMPFAIL
greg Phone #: ###-####
C/N.....Truss corr. posted.
BLD09-01815 BLD-Footing12/28/200912/28/200912/28/2009 4:13:24 PMPPASS
Dane Phone #: ###-####
BLD09-01814 BLD-Footing12/28/200912/28/200912/28/2009 4:13:07 PMPPASS
Dane Phone #: ###-####
BLD09-01813 BLD-Footing12/28/200912/28/200912/28/2009 3:15:43 PMPCANC
Dane Phone #: ###-####
BLD09-01362 BLD-Final12/28/200912/28/200912/28/2009 1:27:45 PMPCANC
Re-sched....
BLD09-01932 BLD-Final12/28/200912/28/200912/28/2009 1:24:53 PMPPASS
Bill ###-####
P/W approved........Erosion control scheduled with Clint.
BLD09-01932 DOC - Permit Finaled12/28/200912/28/200912/28/2009 1:23:00 PMPPASS
BLD09-02195 BLD-Conference12/25/200912/28/200912/28/2009 1:15:26 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Sandra Daffer
BLD09-02195 DOC - Permit Finaled12/28/200912/28/200912/28/2009 1:14:51 PMPPASS
BLD39-00015 BLD-Concrete12/22/200912/28/200912/22/2009 1:07:37 PMACANC
testing Inspection requested from web by: Chris Schmidt Inspection cancelled from web by: Chris Schmidt
BLD39-00015 BLD-Framing/Rough-in12/22/200912/28/200912/22/2009 1:07:15 PMACANC
Scheduled via mobile device. Call for access Name: cms Phone #: 5551234 Inspection cancelled from web by: Chris Schmidt