ESC05-00376
| Site Final | 12/28/2010 | 12/28/2010 | 12/28/2010 4:39:03 PM | P | PASS |
|
|
job done
|
ESC10-00452
| General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 4:33:59 PM | | NR |
|
|
per clint
|
MEC10-04254
| Final | 12/21/2010 | 12/28/2010 | 12/28/2010 4:31:47 PM | P | NR |
|
|
installer sam j ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich...sam wasn't ready...rescheduled for wed am
|
MEC10-03148
| Final | 12/28/2010 | 12/28/2010 | 12/28/2010 3:47:22 PM | P | NH |
|
|
Kevin @ Phone #: ###-#### >> Inspection requested via web by Kevin Pratley...called kevin and left a message...went by house and left a note on the door....reinspection fee
|
MEC10-04325
| Pressure Test | 12/27/2010 | 12/28/2010 | 12/28/2010 3:23:25 PM | P | PASS |
|
|
Luque, John ###-#### rough-in and pressure test needed on gas fireplace Phone #: ###-#### >> Inspection requested via web by David Hurds..20lb gas ok
|
MEC10-04325
| Rough-in | 12/27/2010 | 12/28/2010 | 12/28/2010 3:22:59 PM | P | PASS |
|
|
Luque, John ###-#### rough-in and pressure test needed on gas fireplace Phone #: ###-#### >> Inspection requested via web by David Hurds
|
MEC10-04321
| Final | 12/28/2010 | 12/28/2010 | 12/28/2010 2:48:44 PM | P | PASS |
|
|
Around 2 or 3 please. Thanks! Phone #: ###-#### >> Inspection requested via web by April Sims
|
MEC10-04168
| Final | 12/23/2010 | 12/28/2010 | 12/28/2010 2:02:49 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by David Cole
|