FIR10-00500
| INSP-Sprinkler Rough-in | 12/28/2010 | 12/28/2010 | 12/28/2010 3:32:47 PM | P | PART |
|
|
The sprinkler heads were overspaced at atleast one location along the west wall. Will need to verify spacing compliance and coverage in the kitchen area to have the overhead rough-in completed. The FDC is located too close to the wall PIV. Atleast 3' clearance is required per IFC
|
FIR10-00107
| INSP-Final Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 3:30:01 PM | P | FAIL |
|
|
No city approved plans on site. No inspection was performed.
|
FIR10-00108
| INSP-Final Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 3:29:26 PM | P | FAIL |
|
|
No city approved plans on site. No inspection was performed.
|
FIR09-00321
| INSP-Final Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 3:28:45 PM | P | CANC |
|
|
To be rescheduled with the two AES permits on Phillippi
|
FIR10-00469
| INSP-Final Inspection | 12/27/2010 | 12/28/2010 | 12/28/2010 1:50:17 PM | A | FAIL |
|
|
Arrived at job site. Did not perform inspection because the NetCon rating was a 6 where a 0-5 rating is required.
|
BLD10-02168
| FIRE-Final Inspection | 12/27/2010 | 12/28/2010 | 12/28/2010 9:19:21 AM | A | PASS |
|
|
life safety passed
|
FIR10-00480
| INSP-Final Inspection | 12/27/2010 | 12/28/2010 | 12/28/2010 9:18:24 AM | A | PASS |
|
|
permit finaled
|
FIR10-00468
| INSP-Final Inspection | 12/27/2010 | 12/28/2010 | 12/28/2010 9:17:24 AM | A | PASS |
|
|
permit finaled
|