MEC97-03025
| INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | FAIL |
|
|
rein...NO C/N ONSITE, NEED PROTECTION POST AT GAR.
|
MEC97-03025
| INSP - Rough-in & Gas Pressure | 12/29/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | PART |
|
|
GAS TEST OK, DONE PREVIOUSLY BY 340; HAS C/N RE DUCT AT GAR.( 1HR CONST REQ'D, TO CHK AT FINAL.
|
MEC97-03025
| INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | FAIL |
|
|
rein...NO C/N ONSITE, NEED PROTECTION POST AT GAR.
|
BLD97-01825
| INSP - Carpentry | 12/30/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | PART |
|
|
NEED TO COMPLETE GRADING,GET P.W. OK FOR FINAL
|
BLD97-02223
| INSP - Carpentry | 12/30/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | PART |
|
|
NEED COMPLETE AIR SEALING, SEAL FOR 1 HR. AT GAR. ENG'S & PW OK FOR FINAL
|
BLD97-03404
| INSP - Framing/Rough-in | 12/29/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | PART |
|
|
PORCH...FRAME OK, NEED TO COMPLETE SHEETING & ROOFING.342 AREA.
|
BLD97-03550
| INSP - Framing/Rough-in | 12/29/1997 | 12/29/1997 | 12/29/1997 12:00:00 AM | P | PART |
|
|
floor joist; BEAMS & UPPER FLOOR SUPPORT OK PER PLAN, NEED PLBG R/I FOR SHOWER UPSTAIRS FOR FULL FRAME OK. 342 AREA
|