PLM99-03485
| Final | 12/28/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | A | FAIL |
|
|
###-####. Set laundry sink.
|
PLM99-04032
| Plumbing Rough-in | 12/28/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 09:43:55. Contact: ###-####. Piping incomplete, needs testing.
|
PLM99-02748
| Final | 12/28/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 15:46:15. Contact: ###-####. Final ok.
|
PLM99-03589
| Plumbing Rough-in | 12/28/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | A | PART |
|
|
r/i for the overflow Ann ###-#### late am. OFD's ok.
|
PLM99-03621
| Plumbing Rough-in | 12/29/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 06:53:21. Contact: ###-####. R/I conference ok, needs straping, nailplates, testing.
|
PLM99-03831
| Roof Drains | 12/29/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 08:01:48. Contact: ###-####. Needs 3 sections of OFD tested ad misc. hangars installed.
|
PLM99-04227
| Plumbing Rough-in | 12/29/1999 | 12/29/1999 | 12/29/1999 12:00:00 AM | P | FAIL |
|
|
Tim ###-#### any time after 3pm. W&V system test failed.
|