Inspections for the day of: Wednesday, December 29, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-04193 Final12/28/199912/29/199912/29/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/28/1999 at 09:54:12. Contact: ###-####. Corrections.
MEC99-04332 Final12/28/199912/29/199912/29/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/28/1999 at 10:43:54. Contact: ###-####. No answer to contact call.
MEC99-02651 Final12/28/199912/29/199912/29/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/28/1999 at 11:08:38. Contact: ###-####. Final ok for Pod 5 except room 513 and 505.
MEC99-03193 Final12/28/199912/29/199912/29/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/28/1999 at 14:05:41. Contact: ###-####.
MEC99-03784 Final12/28/199912/29/199912/29/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/28/1999 at 15:55:15. Contact: ###-####.
MEC99-04365 Final12/29/199912/29/199912/29/1999 12:00:00 AMPPART
JOB #18144-BLD99-1603-XENON ###-####. Phase one final- no card.
MEC99-04366 Final12/29/199912/29/199912/29/1999 12:00:00 AMPPASS
JOB #18190-XENON ###-####-NO BLDG # AS PER YMC
MEC99-04367 Final12/29/199912/29/199912/29/1999 12:00:00 AMPPASS
JOB #18215-XENON ###-####-BUILDING #16-NO BLDG # AS PER YMC
MEC99-04368 Final12/29/199912/29/199912/29/1999 12:00:00 AMPPASS
BUILDING #16-JOB #18229-CONTACT:XENON ###-####-NO STRUCTRUAL # AS PER YMC
MEC99-03008 Final12/29/199912/29/199912/29/1999 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 12/29/1999 at 08:31:11. Contact: ###-####. Will recall.
MEC99-04362 Pressure Test12/28/199912/29/199912/29/1999 12:00:00 AMPFAIL
pressure test ###-#### Jennifer Russell. Protect gas pipe through brick and concrete.