Inspections for the day of: Wednesday, December 29, 1999.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC99-04081 Final12/28/199912/29/199912/29/1999 12:00:00 AMAPASS
Joe ###-####
BLD99-01769 BLD-Final12/28/199912/29/199912/29/1999 12:00:00 AMANH
Sawtooth Homes ###-#### . Locked out.
BLD99-03111 BLD-Final12/28/199912/29/199912/29/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/28/1999 at 16:37:49. Contact: .
BLD99-02835 BLD-Framing/Rough-in12/28/199912/29/199912/29/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/28/1999 at 18:04:46. Contact: ###-####. C/N posted.
BLD99-01453 BLD-Framing/Rough-in12/28/199912/29/199912/29/1999 12:00:00 AMANH
Scheduled by a contractor via Hello! on 12/28/1999 at 10:50:31. Contact: . Locked out.
BLD99-03625 BLD-Footing12/28/199912/29/199912/29/1999 12:00:00 AMAPASS
HYRUM ###-####. Footings.
MEC99-04340 Pressure Test12/28/199912/29/199912/29/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/28/1999 at 14:50:37. Contact: ###-####. Gas test fail.
MEC99-03711 Final12/29/199912/29/199912/29/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/29/1999 at 09:17:02. Contact: ###-####. Duct insulation.
BLD99-03397 BLD-Framing/Rough-in12/29/199912/29/199912/29/1999 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/29/1999 at 09:23:45. Contact: ###-####. 2 hold-downs missing.
BLD99-03125 BLD-Energy code compliance12/29/199912/29/199912/29/1999 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 12/29/1999 at 10:36:39. Contact: ###-####. Wrong inspection framing only.
BLD99-03125 BLD-Framing/Rough-in12/29/199912/29/199912/29/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/29/1999 at 10:38:04. Contact: ###-####.
BLD99-03633 BLD-Footing12/29/199912/29/199912/29/1999 12:00:00 AMPPART
DIRK ###-#### 3 TO 4 O'CLOCK. No steel, ground appears to be frozen, contractor will pour when thawed.