PLM00-04385
| Final | 12/27/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | FAIL |
|
|
FN ROB CALL 1ST BEFORE INSP-- ###-#### rp on steamer and bypass on water softenor 12/29/2000 9:45:35 AM
|
BLD00-02170
| BLD-Other | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 330 On 12/29/2000 3:57:54 PM left correction notice - secure a permit for sewer and water lines relocated outside the building, provide documentation from micron reguarding testing and inspection for determination of code compliance, - secure a licensed plumbing contractor to permit 10" storm drain under the building apply test and call for inspection- do not lay asphalt over exterior piping or concrete over interior storm drain untill all waor has been approved for cover.
|
PLM00-04404
| Groundwork | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-04405
| Water and/or Sewer | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
###-#### w/s final
|
PLM00-04407
| Water and/or Sewer | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
###-#### ready at 2
|
PLM00-04358
| Water and/or Sewer | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-03763
| Final | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 10:17:12. Contact: ###-####.
|
PLM00-03763
| Final | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/29/2000 at 10:17:12. Contact: ###-####.
|