BLD00-02368
| FIRE-Final Inspection | 12/28/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | FAIL |
|
|
###-####. Final Fail C/N issued 12/29/2000 2:37:19 PM
|
BLD00-02995
| FIRE-Final Inspection | 12/28/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | FAIL |
|
|
###-####. Final Fail C/N issued 12/29/2000 2:33:14 PM
|
FIR00-00547
| INSP-Sprinkler Rough-in/Hydro | 12/28/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | PART |
|
|
###-####. OK on supply line flush and OK on above ground hydro test except FDC connection 12/29/2000 2:35:03 PM
|
FIR00-00250
| INSP-Sprinkler Rough-in | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 406 On 12/29/2000 2:39:37 PM Spklr rough in West side. Fail Four items to correct
|
BLD00-02995
| FIRE-Final Inspection | 12/29/2000 | 12/29/2000 | 12/29/2000 12:00:00 AM | P | PASS |
|
|
###-####. Reinsp OK for permanant occupancy 1/2/2001 8:19:01 AM
|