FIR03-00272
| FIR-Aging Inspection | 12/29/2003 | 12/29/2003 | 12/29/2003 12:00:00 AM | | NR |
|
|
work in progress 12/29/2003 11:38:30 AM
|
FIR03-00596
| INSP-Sprinkler Rough-in/Hydro | 12/24/2003 | 12/29/2003 | 12/29/2003 12:00:00 AM | A | PART |
|
|
Underground and Overhead hydro tests are OK. I did a rough-in inspection for the rest of the overhead sprinkler piping. Look at the city approved plans for locations that need attention. 12/29/2003 12:59:19 PM
|
MIS03-00242
| FIR-Final | 12/26/2003 | 12/29/2003 | 12/29/2003 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 12/29/2003 10:38:55 AM
|
FIR03-00596
| INSP-Supply line flush | 12/24/2003 | 12/29/2003 | 12/29/2003 12:00:00 AM | P | CANC |
|
|
Inspection was for a underground flush. The contractor could not get United Water there to open the valve 12/29/2003 4:44:27 PM
|
BLD03-01362
| FIRE-Final Inspection | 12/29/2003 | 12/29/2003 | 12/29/2003 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 12/29/2003 1:26:00 PM
|