Inspections for the day of: Wednesday, December 29, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02338 BLD-Framing/Rough-in12/28/200412/29/200412/29/2004 12:00:00 AMAPASS
###-####
BLD04-02005 BLD-Framing/Rough-in12/28/200412/29/200412/29/2004 12:00:00 AMAPASS
requesting approval to insulate exterior walls. Approved plans in black tube on school trailer; Phone #: ###-#### Internet Inspection Request from: Dean McKellip
BLD04-00815 BLD-Final12/28/200412/29/200412/29/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/28/2004 at 1:03:56 PM. Contact: ###-####.
BLD04-01267 BLD-Wall cover12/28/200412/29/200412/29/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/28/2004 at 2:30:14 PM.
MEC04-03606 Rough-in12/29/200412/29/200412/29/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-03606 Pressure Test12/29/200412/29/200412/29/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
BLD04-02087 BLD-Final12/29/200412/29/200412/29/2004 12:00:00 AMPNR
Don; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD04-00815 BLD-Final12/29/200412/29/200412/29/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/29/2004 at 10:59:26 AM. Contact: ###-####. C/N ..... Need Perm occ from Fire and CDHD. Obtain Perm Occ. status for Structural within 90 days of this notice. Complete ramps per appr plan (not 1:12) and install Temp glass at both sides of Front door, and S. side of (S) rear door. Glass protected with plywood at time of inspection. 12/29/2004 2:36:06 PM 12/29/2004 2:41:44 PM