BLD04-02338
| BLD-Framing/Rough-in | 12/28/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD04-02005
| BLD-Framing/Rough-in | 12/28/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | A | PASS |
|
|
requesting approval to insulate exterior walls. Approved plans in black tube on school trailer; Phone #: ###-#### Internet Inspection Request from: Dean McKellip
|
BLD04-00815
| BLD-Final | 12/28/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 1:03:56 PM. Contact: ###-####.
|
BLD04-01267
| BLD-Wall cover | 12/28/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 2:30:14 PM.
|
MEC04-03606
| Rough-in | 12/29/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC04-03606
| Pressure Test | 12/29/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
BLD04-02087
| BLD-Final | 12/29/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | P | NR |
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD04-00815
| BLD-Final | 12/29/2004 | 12/29/2004 | 12/29/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 10:59:26 AM. Contact: ###-####. C/N ..... Need Perm occ from Fire and CDHD. Obtain Perm Occ. status for Structural within 90 days of this notice. Complete ramps per appr plan (not 1:12) and install Temp glass at both sides of Front door, and S. side of (S) rear door. Glass protected with plywood at time of inspection. 12/29/2004 2:36:06 PM 12/29/2004 2:41:44 PM
|