Inspections for the day of: Thursday, December 29, 2005.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00228 FIR-Final12/29/200512/29/200512/30/2005 9:51:00 AMPPART
Temporary Occupancy issued until egress exit sign repaired, fire extinguisher provided, shelving storage reduced to at least 18" below sprinkler pendents, and sticker at egress door.
BLD05-01604 FIRE-Final Inspection12/29/200512/29/200512/29/2005 3:27:51 PMPFAIL
Plug sprinkler heads mounted horizontally in the T.I. space. Reinstall the ball drip at the FDC. Certify the backflow preventor. Relocate the bell to the FDC. Provide above ground hydro test papers. Resubmit fire alarm plans showing the flow switch and tamper switch. Test all of the a/v's. Test all of the elevator functions/recall. Test the access controlled egress doors. Provide map at the FACP. Provide printout of the fire alarm signals. Provide minimum 8.3 AH batteries for the FACP. Life safety is ok to final when all of this is done.
BLD04-02346 FIRE-Final Inspection12/29/200512/29/200512/29/2005 3:27:27 PMPFAIL
Plug sprinkler heads mounted horizontally in the T.I. space. Reinstall the ball drip at the FDC. Certify the backflow preventor. Relocate the bell to the FDC. Provide above ground hydro test papers. Resubmit fire alarm plans showing the flow switch and tamper switch. Test all of the a/v's. Test all of the elevator functions/recall. Test the access controlled egress doors. Provide map at the FACP. Provide printout of the fire alarm signals. Provide minimum 8.3 AH batteries for the FACP. Life safety is ok to final when all of this is done.
FIR05-00396 INSP-Alarm Testing12/28/200512/29/200512/29/2005 3:18:14 PMPFAIL
Plug sprinkler heads mounted horizontally in the T.I. space. Reinstall the ball drip at the FDC. Certify the backflow preventor. Relocate the bell to the FDC. Provide above ground hydro test papers.
FIR05-00068 INSP-Final Inspection12/28/200512/29/200512/29/2005 2:57:12 PMPFAIL
Need to do all of the riser inspection including the forward flush. Provide E.Q. on the three sprig ups. Provide the correct connections for the stage hose valves. There is a clearance issue in the storage room. Check ball drip.