Inspections for the day of: Friday, December 29, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-01951 FIRE-Sprinkler Rough-in12/29/200612/29/200612/29/2006 4:32:01 PMPPART
See approved plans for areas where piping is ok to cover. I found one pendant in front of the restrooms overspaced and four pendants overspaced off of the accordian door in the training room. See approved plans these locations.
BLD06-00569 FIRE-Final Inspection12/28/200612/29/200612/29/2006 4:02:58 PMAPART
A temporary occupancy was given with dave hannimans permission until the sprinkler design/aisle widths are figured out. Also need curbing painted and the racking permit finaled.
FIR06-00257 INSP-Final Inspection12/29/200612/29/200612/29/2006 4:01:25 PMPPASS
Permit finaled
FIR06-00491 INSP-Final Inspection12/28/200612/29/200612/29/2006 3:58:48 PMAPASS
Permit finaled
BLD06-03006 FIRE-Final Inspection12/28/200612/29/200612/29/2006 3:58:19 PMAPART
A temporary occupancy was given with dave hannimans permission until the fire sprinkler/aisles are discussed. Signs for maximum storage need to be installed.
FIR06-00874 INSP-Conference12/28/200612/29/200612/29/2006 2:31:40 PMADONE
Contractor will have to attach earthquake bracing to the top of the trusses, they will have to resubmit if the change the supply to the preaction system and the duct can not be treated as obstructed construction. No approved plans were on site for review.
FIR06-00564 INSP-Supply line flush12/29/200612/29/200612/29/2006 2:23:48 PMAPASS
Underground hydro and flush is passed. Overhead wet system rough-in is passed.
FIR06-00708 FIR-Aging Inspection12/29/200612/29/200612/29/2006 1:17:46 PM NR
work is in progress
FIR06-00789 INSP-Sprinkler Rough-in/Hydro12/28/200612/29/200612/29/2006 1:17:05 PMAPART
The sprinkler rough-in matches the plans for the most part. The fire sprinkler contractor added 12 sprinkler heads due to lack of coverage caused by full height walls. Two of the added heads are in the remote area. Plans will need to be resubmitted as well as hydraulic calculations prior to the project being finaled.
BLD06-00100 FIRE-Final Inspection12/28/200612/29/200612/29/2006 10:43:45 AMAPASS
Life safety finaled
BLD06-02211 FIRE-Final Inspection12/28/200612/29/200612/29/2006 8:56:23 AMAPASS
Life safety finaled
FIR06-00853 INSP-Final Inspection12/28/200612/29/200612/28/2006 2:01:40 PMAPASS
Permit finaled