BLD06-01951
| FIRE-Sprinkler Rough-in | 12/29/2006 | 12/29/2006 | 12/29/2006 4:32:01 PM | P | PART |
|
|
See approved plans for areas where piping is ok to cover. I found one pendant in front of the restrooms overspaced and four pendants overspaced off of the accordian door in the training room. See approved plans these locations.
|
BLD06-00569
| FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 4:02:58 PM | A | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the sprinkler design/aisle widths are figured out. Also need curbing painted and the racking permit finaled.
|
FIR06-00257
| INSP-Final Inspection | 12/29/2006 | 12/29/2006 | 12/29/2006 4:01:25 PM | P | PASS |
|
|
Permit finaled
|
FIR06-00491
| INSP-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 3:58:48 PM | A | PASS |
|
|
Permit finaled
|
BLD06-03006
| FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 3:58:19 PM | A | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the fire sprinkler/aisles are discussed. Signs for maximum storage need to be installed.
|
FIR06-00874
| INSP-Conference | 12/28/2006 | 12/29/2006 | 12/29/2006 2:31:40 PM | A | DONE |
|
|
Contractor will have to attach earthquake bracing to the top of the trusses, they will have to resubmit if the change the supply to the preaction system and the duct can not be treated as obstructed construction. No approved plans were on site for review.
|
FIR06-00564
| INSP-Supply line flush | 12/29/2006 | 12/29/2006 | 12/29/2006 2:23:48 PM | A | PASS |
|
|
Underground hydro and flush is passed. Overhead wet system rough-in is passed.
|
FIR06-00708
| FIR-Aging Inspection | 12/29/2006 | 12/29/2006 | 12/29/2006 1:17:46 PM | | NR |
|
|
work is in progress
|
FIR06-00789
| INSP-Sprinkler Rough-in/Hydro | 12/28/2006 | 12/29/2006 | 12/29/2006 1:17:05 PM | A | PART |
|
|
The sprinkler rough-in matches the plans for the most part. The fire sprinkler contractor added 12 sprinkler heads due to lack of coverage caused by full height walls. Two of the added heads are in the remote area. Plans will need to be resubmitted as well as hydraulic calculations prior to the project being finaled.
|
BLD06-00100
| FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 10:43:45 AM | A | PASS |
|
|
Life safety finaled
|
BLD06-02211
| FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 8:56:23 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00853
| INSP-Final Inspection | 12/28/2006 | 12/29/2006 | 12/28/2006 2:01:40 PM | A | PASS |
|
|
Permit finaled
|