BLD08-02360
| FIRE-Conference | 12/29/2008 | 12/29/2008 | 12/29/2008 7:05:55 PM | P | DONE |
|
|
Some items noted include certification tags required for the fire extinguishers, covers at two SD need removed, one exit sign directs to a key locked door, see fire code review notes for additional guidelines.
|
FIR08-00794
| INSP-Conference | 12/29/2008 | 12/29/2008 | 12/29/2008 7:02:33 PM | P | DONE |
|
|
Regarding site inspection schedule.
|
BLD07-00918
| FIRE-Final Inspection | 12/29/2008 | 12/29/2008 | 12/29/2008 7:01:21 PM | P | PASS |
|
|
Life safety inspection passed-see activity notes 7/3.
|
FIR07-01042
| INSP-Sprinkler Rough-in/Hydro | 12/29/2008 | 12/29/2008 | 12/29/2008 6:58:00 PM | P | PART |
|
|
1st floor install okay for cover only as noted on approved plans.
|
FIR08-00848
| INSP-Final Inspection | 12/26/2008 | 12/29/2008 | 12/29/2008 6:57:21 PM | A | PASS |
|
|
Scope of demo permit work completed per permit documents.
|
FIR08-00847
| INSP-Final Inspection | 12/24/2008 | 12/29/2008 | 12/29/2008 6:56:23 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00827
| INSP-Final Inspection | 12/24/2008 | 12/29/2008 | 12/29/2008 6:55:53 PM | A | PASS |
|
|
Fire alarm field testing passed, permit finaled.
|
FIR08-00851
| INSP-Final Inspection | 12/24/2008 | 12/29/2008 | 12/29/2008 6:55:09 PM | A | PASS |
|
|
Scope of fire sprinkler work passed final inspection.
|