Inspections for the day of: Monday, December 29, 2008.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00626 INSP-Sprinkler Rough-in/Hydro12/29/200812/29/200812/29/2008 6:07:33 PMPPART
The rough-in inspection for the 3" and 2 1/2" mains and 1 1/4" branchline piping passed. Pendant head locations have not been inspected at this time. Per the fitter plans are being resubmitted for pendant head location changes due to revised wall layout. I noted sprinkler coverage missing in four shower areas.
FIR08-00341 INSP-Alarm Testing12/24/200812/29/200812/29/2008 2:40:16 PMAFAIL
Need the north red alarm strobe repaired and tested, the new duct smoke detector does not shut down the hvac unit and the fire alarm system needs to be finished in the existing east rooms.
FIR08-00299 INSP-Final Inspection12/24/200812/29/200812/29/2008 2:21:23 PMAPASS
Permit finaled.
BLD08-01889 FIRE-Final Inspection12/24/200812/29/200812/29/2008 12:11:01 PMAPASS
Life safety passed. Contractor is to have the three thumbturn deadbolts blanked off on all exit doors and lever hardware installed on the northwest exit door. This is to be done prior to the building inspection.