FIR10-00525
| INSP-Sprinkler Rough-in/Hydro | 12/28/2010 | 12/29/2010 | 12/30/2010 12:17:43 PM | P | PASS |
|
|
The overhead hydro test of the wet and dry systems passed.
|
FIR10-00603
| INSP-Final Inspection | 12/29/2010 | 12/29/2010 | 12/30/2010 12:12:16 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00617
| INSP-Final Inspection | 12/29/2010 | 12/29/2010 | 12/30/2010 12:10:44 PM | P | PASS |
|
|
Permit finaled
|
BLD10-02911
| FIRE-Final Inspection | 12/29/2010 | 12/29/2010 | 12/30/2010 12:07:59 PM | P | FAIL |
|
|
Provide approved single action hardware for the two exterior doors, provide annual inspection for the fire extinguishers and lower the plastics to less than 6'-0"
|
FIR10-00500
| INSP-Sprinkler Rough-in | 12/28/2010 | 12/29/2010 | 12/29/2010 11:43:07 AM | A | PASS |
|
|
The overspaced heads have been adjusted. To final the FDC needs relocated as discussed, tags for both the wet and anti-freeze risers, fire alarm interconnect and canopys installed.
|
FIR03-00510
| INSP-Final Inspection | 12/27/2010 | 12/29/2010 | 12/29/2010 12:00:00 AM | A | CANC |
|
|
cancelled 12/29/10 8:24am by Alex/Oxarc, he already called Troy//alex - 9:00 am Phone #: ###-####
|
FIR10-00548
| INSP-Final Inspection | 12/28/2010 | 12/29/2010 | 12/28/2010 2:27:59 PM | A | CANC |
|
|
Call Jeff at ###-#### Phone #: ###-#### >> Inspection requested via web by Mike Brown Inspection cancelled from web by: Mike Brown
|