PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, December 29, 2010
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC10-00495
General Inspection
12/29/2010
12/29/2010
12/29/2010 4:10:59 PM
PASS
ESC10-00456
BMP Violation
12/28/2010
12/29/2010
12/29/2010 3:44:13 PM
A
FAIL
Correction Notice to RP:
Install storm drain inlet protection on all new storm drains within the south zsection of the project area.
Proir to anymore mortar mixing, contain the mortar mixing area located on the hard surface.
Failure to comply will result in a stop work order. Will re-inspect on 12/30/2010PM
ESC10-00814
BMP Violation
12/29/2010
12/29/2010
12/29/2010 2:12:46 PM
A
FAIL
Correction Notice:
(Observed turbid water being discharged from a channel constructed by the contractor to flow into the parking lot to the north that found the low flow point to the storm drain within the north parking lot. Photo's have been taken.)
No discharging of turbid water off site and/or into any storm drain inlets.
Clean up all surfaces of all sediment and debris off of all hard surfaces.
Maintain or replae all storm drain inlet protection.
Correct by 12/29/2010 pm. Failure to comply willl result in a Stop Work Order. Will re-inspect on 12/30/2010 am.
ESC10-00472
General Inspection
12/29/2010
12/29/2010
12/29/2010 1:37:24 PM
PASS
Temporary BMP's inplace but site has not achieved final stabilization.
ESC10-00482
General Inspection
12/29/2010
12/29/2010
12/29/2010 1:09:06 PM
PASS
ESC10-00470
General Inspection
12/29/2010
12/29/2010
12/29/2010 12:58:56 PM
PASS
ESC10-00657
General Inspection
12/28/2010
12/29/2010
12/29/2010 9:50:12 AM
A
PART
RP has installed energy disapators along the driveway up the slope to collect sediment and slow the velocity of the drainage flow cominng down the driveway. Also at the back of asphalt a sediment barrier was installed to not allow any runoff onto the hard surface.
ESC05-00641
Site Final
12/28/2010
12/29/2010
12/29/2010 9:47:48 AM
A
PASS
ESC05-00641
DOC - Permit Finaled
12/29/2010
12/29/2010
12/29/2010 9:47:35 AM
P
PASS
ESC04-01526
Site Final
12/28/2010
12/29/2010
12/29/2010 9:47:17 AM
A
PASS
ESC04-01526
DOC - Permit Finaled
12/29/2010
12/29/2010
12/29/2010 9:47:09 AM
P
PASS