FIR14-00836
| INSP-Sprinkler Rough-in | 12/29/2014 | 12/29/2014 | 12/29/2014 4:25:00 PM | P | PART |
|
|
Verified additional coverage opposite the new wall at the laundry room area 1st floor.
|
FIR14-00470
| INSP-Final Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 4:07:58 PM | P | PEND |
|
|
Jeff C. is your contact ###-####. Please call 1/2 hour prior to inspection. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR14-00807
| INSP-Sprinkler Rough-in | 12/29/2014 | 12/29/2014 | 12/29/2014 4:06:38 PM | P | PART |
|
|
UG fire supply line approved for bury from the point of connection to the stub in at the stem wall.
|
BLD14-03406
| FIRE-Conference | 12/29/2014 | 12/29/2014 | 12/29/2014 2:05:29 PM | P | DONE |
|
|
Regarding fire sprinkler coverage at the tenant remodel area.
|
BLD14-03640
| BLD-Final | 12/29/2014 | 12/29/2014 | 12/29/2014 12:22:37 PM | A | PASS |
|
|
Life safety passed provided "door to remain unlocked..." signage is posted.
|
BLD14-02771
| FIRE-Final Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 11:54:04 AM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR14-00862
| INSP-Conference | 12/29/2014 | 12/29/2014 | 12/29/2014 11:48:36 AM | A | DONE |
|
|
Provide as-built plans at final inspection to reflect scope of work completed.
|