PLM15-01169
| Final | 12/29/2015 | 12/29/2015 | 12/29/2015 3:32:31 PM | P | PASS |
|
|
corrections made
|
PLM15-03046
| PLM-Aging Inspection | 12/29/2015 | 12/29/2015 | 12/29/2015 3:28:36 PM | | PART |
|
|
wip
|
PLM15-03046
| DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 3:26:49 PM | P | CANC |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
PLM15-04404
| Groundwork | 12/29/2015 | 12/29/2015 | 12/29/2015 3:15:11 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen >need approved plans, job trailer is locked >need address posted on buildings
|
PLM15-04401
| DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 2:41:10 PM | P | PASS |
|
|
|
PLM15-04401
| Water and/or Sewer | 12/29/2015 | 12/29/2015 | 12/29/2015 2:40:46 PM | P | PASS |
|
|
Should be ready around 11 am Phone #: ###-#### Inspection requested via web by steve bruneel
|
PLM15-04393
| DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 2:40:02 PM | P | PASS |
|
|
|
PLM15-04393
| Water and/or Sewer | 12/29/2015 | 12/29/2015 | 12/29/2015 2:39:50 PM | P | PASS |
|
|
Aaron-water line Phone #: ###-#### >new water line from meter to home ok. >well connected to sprinklers only.
|
PLM15-04402
| Water and/or Sewer | 12/29/2015 | 12/29/2015 | 12/29/2015 2:13:38 PM | P | PASS |
|
|
Michael Phone #: ###-#### >new water line ok >sprinkler tee but no riser
|
PLM15-04402
| Plumbing Rough-in | 12/29/2015 | 12/29/2015 | 12/29/2015 2:12:41 PM | P | CANC |
|
|
Michael Phone #: ###-####
|
PLM15-04374
| Final | 12/28/2015 | 12/29/2015 | 12/29/2015 1:34:51 PM | P | PASS |
|
|
Please call homeowner, Bill ; Joy Thomas, ###-####, prior to inspection. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM15-04336
| Final | 12/29/2015 | 12/29/2015 | 12/29/2015 11:40:29 AM | A | FAIL |
|
|
>Install ASSE 1070 approved tempering valves at lavs. per 413 ISPC >Pipe water heater T&P to approved location with approved material. closet on backside of water heater has a floor drain. >Install double check backflow premise protection on building main water line. per AWWA, it appears there is not one currently.
|
PLM15-04350
| Plumbing Rough-in | 12/29/2015 | 12/29/2015 | 12/29/2015 10:36:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM15-03117
| Final | 12/28/2015 | 12/29/2015 | 12/29/2015 10:03:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
PLM15-04227
| Plumbing Rough-in | 12/29/2015 | 12/29/2015 | 12/29/2015 9:07:55 AM | A | PASS |
|
|
Lockbox 1049 Phone #: ###-#### Inspection requested via web by Craig Johnson
|
PLM15-04336
| Final | 12/28/2015 | 12/29/2015 | 12/29/2015 8:34:15 AM | A | CANC |
|
|
AFTER 9 AM Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
|
PLM15-03038
| DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 8:02:37 AM | P | PASS |
|
|
|
PLM15-03038
| PLM-Aging Inspection | 12/29/2015 | 12/29/2015 | 12/29/2015 8:02:13 AM | | PASS |
|
|
work was completed ok
|
PLM15-01933
| DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 8:00:34 AM | P | PASS |
|
|
|
PLM15-01933
| PLM-Aging Inspection | 12/29/2015 | 12/29/2015 | 12/29/2015 8:00:07 AM | | PASS |
|
|
job completed
|