FIR16-00816
| INSP-Final Inspection | 12/29/2016 | 12/29/2016 | 12/29/2016 2:04:42 PM | P | PASS |
|
|
permit finaled
|
BLD16-04254
| FIRE-Final Inspection | 12/28/2016 | 12/29/2016 | 12/29/2016 12:21:50 PM | A | PART |
|
|
A 30 day temporary occupancy is being given with Ron's permission to allow the fire sprinkler permit/modifications to be completed.
|
BLD16-04317
| FIRE-Final Inspection | 12/28/2016 | 12/29/2016 | 12/29/2016 10:16:34 AM | A | PASS |
|
|
Life safety passed
|
FIR16-00709
| INSP-Final Inspection | 12/28/2016 | 12/29/2016 | 12/29/2016 9:03:33 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00816
| INSP-Sprinkler Rough-in | 12/28/2016 | 12/29/2016 | 12/29/2016 9:03:13 AM | A | PASS |
|
|
Rough-in passed. piping can be covered.
|
BLD16-04245
| FIRE-Final Inspection | 12/28/2016 | 12/29/2016 | 12/29/2016 8:30:55 AM | A | PASS |
|
|
life safety passed
|